Sign In | Join Free | My xuijs.com
China Wuxi Xianglong Plastic Technology Co., Ltd. logo
Wuxi Xianglong Plastic Technology Co., Ltd.
Wuxi Xianglong Plastic Technology Co., Ltd.
Verified Supplier

3 Years

Home > Cooling Tower Fins >

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

Wuxi Xianglong Plastic Technology Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

Brand Name : XL

Model Number : XL-610-VF

Certification : SGS

Place of Origin : Jiangsu, China

MOQ : 10 square meters

Price : $1.2-2/square meters

Payment Terms : Western Union, T/T, MoneyGram, D/P, D/A, L/C

Supply Ability : 1000m2/per pay

Delivery Time : 10 working days

Packaging Details : Wooden,cartons,custom package

Cooling Type : Cooling Tower Parts

Material : PVC,PP,CPVC

Warranty : 1 Year

Name : Generally, the cooling tower needs to be replaced once after 5-8 years of normal use. In the absence of normal maintenance, the packing needs to be replaced once every 2 years. If the following abnormality occurs in the packing in the tower, it should be r

Width : 305/610mm

Length : 1220/1830/2440/customized

Usage : Cooing Tower

MOQ : 10 square meters

Thickness : 0.32-0.6mm

Wave Height : 12/15/19/30mm

Contact Now

PVC fill for water cooling tower plastic honeycomb pvc infill media cooling tower pvc filler

Description:

Cooling Tower PVC Fill, also called cooling tower infill film media. It is one of the most important components in cooling tower. It’s function is increase the exchange area of the gas and working fluid in order to achieve the requested cooling requirement. The working fluid was distributed onto the cooling tower PVC fill and spread into a thin film uniformly, by increasing the air-media interface and allowing waste heat to evaporate at an accelerated rate.

The heat resistance is the main factor influencing the cooling efficiency for the cooling tower PVC fill. And the quality of the raw material used for producing cooling tower PVC fill will influence the cooling tower fill's service time. always adapt the high quality cooling tower PVC fill for the cooling tower.

This type cooling tower PVC fill is designed for the factory-assem

bled counterflow cooling towers.

Specifications:

Tech Date

Sheet Width(mm)

305/610mm

Sheet Length

1220/1830/2440mm/customized

Thickness

0.32-0.6mm/customized

Sheet Spacing

12/15/19/30mm

Color

grey/white/black

Material

PP/PVC/

CPVC

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

How to replace the cooling tower packing

Generally, the cooling tower needs to be replaced once after 5-8 years of normal use. In the absence of normal maintenance, the packing needs to be replaced once every 2 years. If the following abnormality occurs in the packing in the tower, it should be replaced in time, so that the thermal efficiency of the whole tower can reach the predetermined target.

*1. Scaling. The packing in the tower body forms scale, which is generally calcium carbonate scale attached to the packing, which is stone-like and has a relatively hard texture.

*2. Sinking. Due to the contamination of heavy mud ash, the tower body packing sometimes breeds a large number of algae organisms, which causes the packing to sink and cannot be used.

*3. Aging. After long-term use, the filler gradually becomes old, brittle and easy to break due to the erosion of water and air. The aging of high-temperature tower packing is faster than that of ordinary towers, and it is generally replaced once every 4 to 6 years.

*4. Incorrect selection or improper operation will cause serious damage to the cooling tower packing. All types of cooling towers have design work index values, and incorrect selection will directly lead to serious damage and scrapping of the cooling tower. In terms of important working indicators such as inlet water temperature and configuration tonnage, if the working index is greater than the design index value due to improper operation, it will also cause serious damage to the packing.

Related Cooling Tower Film Fill

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

Supply in industry

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

How do fills work in the cooling tower?

Cooling towers reject heat from water-cooled system to the atmosphere. Hot water from the system enters the cooling tower and is distributed over the fill (heat transfer surface). Air is induced or forced through the fill, causing a small portion of the water to evaporate. This evaporation removes heat from the remaining water, which iscollected in the cold water basin and returned to the system to absorb more heat. Each cooling tower line, although operating under the same basic principle of operation, is arranged a little differently.

PACKING AND DELIVERY

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

About US

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material


Product Tags:

counter flow Cooling Tower Fins

      

305mm Cooling Tower Fins

      

610mm cooling tower packing material

      
Best Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material wholesale

Counter Flow Cooling Tower Fins 305/610mm Cooling Tower Packing Material Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Wuxi Xianglong Plastic Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0